Side Stream Filtration for Heathrow Terminal 5

Client:                 BAA

Date:                     2012

Building:              London

Sector:                 Aviation/Public Transport

Due to the success of the Amazon Side Stream filters installed previously at the Heathrow Energy Centre, the same system was selected for a major project initiated to ensure the high performance and accurate control of the heating system operating in Terminal 5.

The system volume was significant – in excess of 500,000 litres of water, therefore requiring the installation of 8 filter housings in each of the two main plant rooms.

See the presentation below for more information:


 